Site Work
Utilizing updated GPS positioning tools, equipped dozers and graders, Sunesis Environmental can precisely grade any site to paving tolerances if needed. With our well-maintained fleet of equipment and the expertise of our teams we can meet your scheduling needs and exceed your expectations.
Sunesis Environmental Has Extensive Expertise In:
- Foundation Removal
- Clearing & Grubbing
- Erosion Control
- Underground Utility (Installation & Relocation)
- Earthwork & Grading
- Aggregate Base
- Concrete (curbs, walks, pavement)
- Retaining Walls (CIP & Modular)
View a few of our Site Work projects below:
University of Kentucky
Grehan Journalism Building
Turner Construction Company
Performed asbestos abatement and demolition services. Project also included excavation of soil to allow for a new building foundation.
University of Kentucky
Student Center
Messer Construction
Project included mass excavation, storm and sanitary along with abatement, structural and selective demolition.
Ohio University
President Street
Ohio University
Project included the structural demolition and asbestos abatement of this 5 story 70,000sf structure including backfill, site utilities, new concrete walks, pavement, asphalt and sod placement. Project was performed successfully despite limited space and significant logistical challenges.
University of Kentucky - Grehan Journalism Building
Turner Construction Company
Value: $670,000
Completed in 2018
Performed asbestos abatement and demolition services. Project also included excavation of soil to allow for a new building foundation.Â
University of Kentucky - Student Center
Messer Construction
Value: $6,550,000
Completed in 2017
Project included mass excavation, storm and sanitary along with abatement, structural and selective demolition.
Ohio University - President Street
Ohio University
Value: $839,000
Completed in 2016
Project included the structural demolition and asbestos abatement of this 5 story 70,000sf structure including backfill, site utilities, new concrete walks, pavement, asphalt and sod placement. Project was performed successfully despite limited space and significant logistical challenges. Â